Project EnergyConnect – Construction Update – Dinawan Camp Expansion

The EnergyConnect project team are continuing to advance construction activities on the transmission line from Buronga to Dinawan near Bundure, NSW. As part of this work, Elecnor is expanding its accommodation camp at Dinawan to increase its workforce on construction activities in the area.

From mid-March 2025, there will be an additional 80 beds at the Dinawan camp, increasing occupancy at the camp to 463 beds, which will remain in place for the duration of the project. These additional temporary accommodation buildings will be transported to the Dinawan site from the project’s existing construction camp at Buronga.

The approved standard hours for construction activity and laydown operations are:
• 7am to 6pm Monday to Friday
• 8am to 1pm Saturdays
• At no time on Sundays and NSW Public Holidays

You can expect to see the transportation of accommodation units by heavy on Arumpo Road, Buronga, and the Sturt Highway as these travel from the Buronga camp in the Wentworth LGA to the Dinawan camp in the Murrumbidgee LGA.

For further information, view the update below:

Community Consultation Session – Pomona

Need skilled workers? Join the FREE 2025 Industry Workshop on Skilled Migration.

Need skilled workers? Join the FREE 2025 Industry Workshop on Skilled Migration.

The workshop is for regional industries, employers, and local governments to learn how migration policies can support workforce needs.

You’ll get insights on:

  • The NSW Skills Plan and State Migration Plan, which is a wholistic approach to place-based skills planning
  • How migration levers can be designed to address gaps in the skilled workforce through a statewide Designated Area Migration Agreement
  • A chance to provide feedback on NSW government initiatives

📅 Upcoming dates and locations:

Broken Hill – Tue, 11 March: https://lnkd.in/gabZ3HQ5

Buronga – Mon, 24 March: https://lnkd.in/gPW-FMnr


🔗 Secure your FREE spot today!

Child Car Seats & Restraints Workshop

DARETON RAW WATER SUPPLY ISSUES

DARETON RAW WATER SUPPLY ISSUES

*** Update: 25 February 2024, 3:09pm**

Raw Water at reduced capacity

The Raw Water Pump Station for Dareton is currently operational but at a reduced capacity.

It is requested that where possible the use of raw water by the Dareton community is minimised.

Wentworth Shire Council is looking to get the Raw Water Pump Station fully operational in the coming days.

Further updates will be provided.

Please note that filtered water supply is not impacted for Dareton.

Wentworth Shire Council apologises for any inconvenience.


Urgent repairs to Raw Water Pump Station

The Raw Water Pump Station for Dareton requires urgent repairs today (Tuesday 25 February 2025), as such raw water supply for Dareton will have significantly reduced pressure.

Wentworth Shire Council is looking to get the pump station back operational as soon as possible. 

An update will be provided later in the day.

Please note that filtered water supply is not impacted for Dareton.

Wentworth Shire Council apologises for any inconvenience.

Spontaneous Volunteers – Resilience Mindset Training

DA2025/021 – MANUFACTURED HOME ESTATE

Saturday 22 February 2025

AusFly 2025 Community Day Returns to Wentworth – Bigger and Better Than Ever

DA2025/020 – DEMOLITION OF EXISTING BUILDINGS